Remodeling in 2027: the dates Peninsula homeowners should know
Heat pump permit fees get a cap, same-size window swaps get easier, and the gas water heater rule moved to 2028. The 2027 dates, checked at the source.
A permit applied for in 2027 follows the 2025 California codes, the ones in force when you apply; supplements take effect July 1, 2027, with no changes to the Residential or Energy Codes.
From January 1, 2027, SB 222 caps a city's permit fee at $150 for a heat pump water heater and $200 for a heat pump HVAC system, unless the city backs a higher fee with a written finding adopted by resolution or ordinance, and SB 908 gives same-size, same-place window replacements administrative approval.
From July 1, 2027, a firm doing paid work that disturbs lead-based or presumed lead-based paint needs a state certificate, and so does at least one person on site.
The dates at a glance
Illustration
01 / 07
January 1, 2027
Windows (SB 908)
What changes
Replacing windows with ones "of the same size and in the same location" gets administrative approval, with no hearing. The windows still have to meet the state codes, wildfire and energy included [8].
Illustrations show the kind of work each date touches; they are not photos of Amiari projects. The dates and rules are quoted from this guide, with its source numbers.
News · November 4, 2026 · The Bay Area Air District's board delayed its zero-NOx requirement for home gas water heaters from January 2027 to January 2028, and added exemptions. [1]
Say you're planning to redo the kitchen and the hall bath in 2027, and maybe finally replace the old water heater while the walls are open. Good news first: the building codes your permit follows won't change under you. A handful of dates around them will, and several of them work in your favor.
Here's the year in order: which codes apply, what changes on January 1 and July 1, and what's coming right after.
Which building codes apply to a 2027 remodel permit?
The ones in force on the day you apply. State law says only the standards "effective at the local level at the time an application for a building permit is submitted" apply to that permit [2]. For all of 2027, that's the 2025 California codes, in effect since January 1, 2026 [3][2].
The state publishes supplements to those codes on January 1, 2027, and they take effect July 1, 2027. The Building Standards Commission says they bring no changes to the Residential or Energy Codes [4]. The next Energy Code is set to take effect January 1, 2029 [5]. Cities can't add much on top in the meantime: AB 130 bars cities from setting building standards for homes that are stricter than the state's from October 1, 2025 through June 1, 2031, with exceptions [6].
What it means for you. A permit filed any time in 2027 stays on the 2025 codes. One filed from July 1 also picks up the supplements, which leave the Residential and Energy Codes alone. In a fire zone, they may matter more, as we explain below. Our kitchen permit guide and bathroom permit guide cover the rules a permit brings now.
What changes on January 1, 2027?
Three new state laws start with the new year, and a Palo Alto rule is set to start then too.
What
What changes
Source
Heat pumps (SB 222)
A city's permit fee is capped at $150 for a heat pump water heater and $200 for a heat pump HVAC system, unless the city shows a higher reasonable cost in a written finding adopted by resolution or ordinance. Third-party technology fees aren't counted. Cities must post their requirements and fees. Cities under 5,000 people and counties under 150,000 are left out of the cap and the posting rule. A plug-in window air conditioner or window heat pump needs no permit or inspection if it runs on 120 volts or less, is self-contained, and needs no dedicated circuit, panel upgrade, drainage or structural work. An HOA rule that prevents replacing a gas appliance with a code-compliant electric one is void, and an HOA can't prohibit or restrict a heat pump water heater or heat pump HVAC system, with limited exceptions. The permit rules don't cover new home construction.
[7]
Windows (SB 908)
Replacing windows with ones "of the same size and in the same location" gets administrative approval, with no hearing. The windows still have to meet the state codes, wildfire and energy included. Homes individually listed on the California Register or a local historic register, or counted as contributors to a locally listed district (if designated before the application), are excluded, unless the local listing rests mainly on the building's age.
[8]
Debris deposits (AB 2559)
A city that takes a construction-debris deposit must refund it in full if, within three years of the final inspection, you show you met its terms.
[9]
Palo Alto air conditioners
Ordinance 5665 says that for permit applications from January 1, 2027, a new or replacement air conditioner in a single-family home brings added efficiency work: airflow and refrigerant checks, attic insulation and air sealing, with exceptions, including when the existing panel can't supply a heat pump but can supply the air conditioner, shown by load calculations. Its state filing is unconfirmed (see below).
[10]
What it means for you. If a heat pump is on your list, 2027 can make the permit cheaper and simpler, and your HOA generally can't say no to the switch itself [7]. If you're swapping old windows, keeping each one the same size and in the same spot keeps the approval simple [8]. In Palo Alto, the Energy Commission describes the air conditioner rule as encouraging heat pumps "while allowing for air conditioners with additional efficiency measures" [11]. It approved the ordinance on January 21, 2026, but the Building Standards Commission's list we read in October didn't show it, so confirm at plan check [11][12]. Our Palo Alto guide has the city's other rules.
What changes on July 1, 2027?
Lead-safe work gets a state certificate. From July 1, 2027, a firm doing paid renovation, repair or painting that will disturb lead-based or presumed lead-based paint needs a California certificate, and so does at least one of its people on site [13]. The penalty is "no less than ten thousand dollars ($10,000) per violation per day" [13]. The date has moved before: a 2023 law pushed it back from January 1, 2024 [14].
Heat pump inspections get easier. Every city must offer heat pump inspections that don't need the contractor and the inspector there at the same time, or remote inspections instead, though an inspector can still call for a joint visit [7].
The code supplements take effect. That includes changes approved in August 2026 [4]. One of the proposals on that August agenda, SFM 04/25, would make it permanent that the wildfire code covers local High, not only Very High, fire hazard zones. It would also hold additions and alterations to the standard for new buildings, and drop the old exemption for additions to and remodels of buildings first built before July 1, 2008 [15]. We couldn't confirm the final vote, so ask the building department which version applies to your application. Among our 12 cities, Palo Alto, Cupertino and Saratoga have Very High zones, and Hillsborough, San Carlos, Redwood City and Los Altos have High ones, on the State Fire Marshal's recommended maps [16]. Saratoga, and San Mateo and Belmont through San Mateo Consolidated Fire, also apply the code in Moderate zones [17][18]. Our guide to where an ADU can go explains the fire maps.
What it means for you. In a house built before 1978, ask each bidder whether they'll hold the state certificate for work from July 1. In a fire zone, a permit filed in June and one filed in July may not follow the same wildfire rules.
What about PG&E?
By September 30, 2027, state regulators must set timelines for electric companies they regulate, like PG&E, to respond to and process requests for "small energization projects", which the law defines as ones that don't need a line extension or upgrade under the utility's line-extension rules [19]. If your remodel needs new or bigger service from PG&E, start that request early.
What's coming right after 2027?
Gas water heaters, 2028. On November 4, 2026, the Air District's board moved the zero-NOx requirement for home gas water heaters from January 2027 to January 2028 and added exemptions [1]. In the text presented to the board, a gas storage water heater made after January 1, 2028, over 30 gallons and up to 75,000 BTU an hour, can't be sold or installed unless it's zero-NOx [20]. Tanks of 30 gallons or less and mobile home units are excluded [1]. Units rated above 75,000 and up to 2,000,000 BTU an hour, which typically include tankless ones, move to 2033 [20][21]. Hydronic units get the same 2033 date with a certificate [20], and the Air District says water heaters in multifamily buildings and deed-restricted affordable housing also move to 2033 [1]. As presented, the other exemptions also need a certificate before installation. They cover lower-income or housing-cost-burdened owners, and one-time replacements in an enclosed space under 700 cubic feet that can't be fitted with a louvered door, grille or duct, under a low ceiling, or where a licensed contractor certifies specific wiring or panel limits; the one-time ones don't apply to newly built homes [20]. The Air District hadn't posted the adopted text when we checked.
Gas furnaces, 2029. The Air District's rule requires zero-NOx for furnaces made after January 1, 2029 [22]. Its staff say that date is "currently being evaluated" [21].
What it means for you. The rules turn on when a unit was made, not when it's installed [20][22], but the dates are close enough to plan around. If your remodel will replace the water heater or the furnace, decide between a heat pump and gas while the design is still on paper.
What Amiari knows
Our take: 2027 is a calm year on the code front, and a few things get easier. That makes it a good year to plan well.
Put the heat pump in the plan, not the wish list. The permit fee cap and the HOA rule start January 1 [7]. If the walls are open anyway, it's the easy moment.
Swapping windows? Keep the size and the spot. That's what gets the simple approval [8]. A bigger opening is a different project.
Older house? Ask about the lead certificate. From July 1, 2027, for paid work that disturbs lead or presumed lead paint, the firm and someone on site need it [13]. We'd ask before signing, not after demolition starts.
Decide the water heater before the walls close. The space and electrical exemptions describe the existing room and panel [20], so a remodel that changes the room or the panel can change the answer. We'd settle it early.
The rules aren't the hard part this year. Getting your plans in order early is.
Amiari Construction builds custom homes, ADUs and additions, and remodels kitchens and baths, on the Peninsula.
How we checked this: In November 2026, Amiari Construction read the 2025–26 session's chaptered laws in the Legislature's own data download (SB 222, SB 908, AB 2559 and SB 1196), Health and Safety Code §§18938.5, 18941.5 and 105254, the Air District's November 4, 2026 release and its Rule 9-6 and 9-4 texts and staff report, the Building Standards Commission's newsletter and wildfire code proposal (saved official copies, because the Commission's site was blocked to us that day), the Energy Commission's pages, the State Fire Marshal's bulletin, and Palo Alto's Ordinance 5665, and drew on the State Fire Marshal's fire hazard maps as we read them in October 2026.
Step by step
01Check your application dateYour permit follows the codes in force on the day you apply, so note which side of July 1, 2027 you'll file on.
02Plan the water heater and furnaceIf the remodel replaces gas equipment, decide early between a heat pump and a gas unit, knowing the Air District's 2028 water heater date and its 2029 furnace date, which is under review.
03Ask about leadIn a house built before 1978, ask each bidder whether they'll hold California's lead certificate for work from July 1, 2027.
04Ask the city in writingAsk the building department which rules apply to your application date, and in a fire zone, which wildfire code version.
Remodeling in 2027: the dates Peninsula homeowners should knowamiari.com · 8 min read
Planning a 2027 remodel?Tell us what you want to change and roughly when. We'll tell you which of these dates touch your plans and what to ask the city first.
Have plans already, or need help getting started? We’ll help coordinate the right team and guide your project from the first ideas through construction. Prefer email? info@amiari.com
Share your projectAnswer a few quick questions about your project and goals.
We connectWe'll reach out within one business day to learn more and discuss your needs.
Plan and estimateWe'll provide preliminary insights and a clear path forward with next steps.
A
AmiariWe reply within one business day
San Carlos Whole Home Reconfiguration
Hi, we're Amiari. You were reading “Remodeling in 2027: the dates Peninsula homeowners should know”. Let's talk about your home.