Saratoga Container ADU - completed project image

Saratoga Container ADU

A 20-foot steel container converted into a complete backyard living space, with the foundation, utilities, structural openings, and surrounding deck coordinated before crane placement.

Location
Saratoga, California
Project type
Container ADU
Size
Approx. 160 sq ft
Duration
6 Months
Year
2021

The story

It came over the house on a crane. It had to land right the first time.

Because the container had to be lifted over the house and placed by crane, the site needed to be fully prepared before it arrived. We coordinated the foundation, underground power, air-conditioning connections, and a sewer run extending more than 100 feet across the property.

Rather than burying the sewer connection beneath the concrete slab as originally shown, we routed it along an accessible path beside the foundation. This gave the owner a practical service point if repairs are ever needed without cutting into the slab.

We repeatedly verified the slab elevation, dimensions, and anchor locations so the container could land correctly on the first placement. Once set, we managed the steel modifications, framing, insulation, waterproofing, interior systems, and finish work that turned the shell into a complete living space.

“A small footprint with no room for guesswork.”

“A small footprint with no room for guesswork.”

“A small footprint with no room for guesswork.”

From the build

How it was built

Month by month, from the first trench to the last coat of paint.

Getting the Yard Ready for the Crane

Before the container arrived, we poured the slab, set the anchor points and ran the power and sewer lines. All of it had to line up with the steel box, so the crane could set it down in one go.

March 2021

First, a long trench.

This is the backyard before we started. The sewer line had a long way to go across it, so the trench came first.

The backyard and pool before work started.
The trench for the new sewer line, dug across the yard.
April 2021

A slab made to fit the container.

Forms, steel and pipes went in, then concrete. We checked the height, the size and the anchor spots again and again, so the container would land right the first time.

Steel and pipes in the forms, ready for concrete.
The sewer line runs beside the slab, so it can be reached later.
The new slab, with its pipes waiting for the container.
May 2021

Up and over the house.

The container came in on a crane, over the house and down onto its slab. One of the crew guided it in with a rope.

Over the roof and on its way to the backyard.
Guiding the container down with a rope.
Landed on its slab, still hooked to the crane.

Turning a Steel Box into Rooms

Once the container was down, we cut the openings and framed them in new steel. Then came wood walls inside, and the pipes and wiring.

July 2021

Cutting into the steel.

We cut openings for the glass and the windows, then framed them with new steel so the box stays strong.

A window opening cut into the side wall.
Cutting steel tube to frame the new openings.
The steel floor frame, seen through the open doors.
July and August 2021

Insulation under the floor, then wood walls.

Insulation went in between the steel floor beams. Then wood walls went up inside the steel, ready for pipes and wires.

Insulation between the steel floor beams.
Wood walls going up inside the steel shell.
September 2021

Pipes and wires go in.

The plumbing and wiring went in for the kitchenette and the bathroom.

Water lines, drains and wiring in the new wall.

Warm Inside, Finished Outside

We sprayed the whole shell with foam, put up the cedar ceiling and did the finish work inside. Outside, a new deck and lawn tie it to the yard, and the steel got a coat of gray paint.

September 2021

Sealed in foam.

Steel lets heat and cold right through, so the whole shell got a thick coat of spray foam.

Spraying foam on the walls.
Walls and ceiling, all in foam.
The next spring

A deck to join it to the yard.

Then came the deck, so the glass doors open right onto it, with a new lawn around it.

The deck frame going in along the glass wall.
The deck done and the lawn in, before the paint.
The next spring

A coat of gray paint.

We covered the glass and the deck, then painted the steel gray.

Glass and deck covered up for painting.

The finished home

Steel outside. Warm wood inside.

The main room. The glass wall opens onto the deck and the pool.
The bathroom, with a small wood vanity.
A sink and a cooktop on the kitchenette counter.
The shower, with a window up high.
Two globe lights beside the bathroom mirror.
The kitchenette, with the bathroom just through the door.
Outside, the water heater sits right on the steel wall.

Before and after

The day it landed, and the way it looks now.

After: the finished container at dusk, with its glass wall lit up, the new deck and the lawn
Before: the container hanging from the crane just above its new slab
BeforeAfter

Drag across the photo to compare.

The result

What the owner has now.

  • A complete little home in the backyard
  • A wall of glass facing the pool
  • A warm cedar ceiling
  • A kitchenette, and a bathroom with a shower
  • A sewer line that can be reached without breaking the slab
  • A deck that steps right out to the yard

It feels like part of the yard, not something dropped into it.