The story
At first glance, this project looks calm and straightforward. It wasn’t.
Most of the original house had to come apart before it could come back together. The challenge was that city requirements still required portions of the existing structure to remain, even though nearly everything around it was changing.
New foundations, structural upgrades, reworked framing, higher ceilings, and a completely different layout all had to be tied into pieces of a house that were never originally designed for it.
Projects like this are rarely about one big problem. They’re about hundreds of small decisions that have to be made correctly so the project keeps moving.
This was one of those projects.
From the build
How it was built
Foundation & Structural Framing
The project started with major excavation and a foundation rebuild. Framing was the hardest part — the structural requirements and architectural vision didn't always align. Careful coordination at each step preserved the design intent while keeping the structure practical, buildable, and compliant.
Behind the Walls
Complex framing left limited space for HVAC, plumbing, and electrical. Through constant coordination, site meetings, and field adjustments, we found practical solutions that kept every system working together.
Finish Coordination
Drywall, doors, paint, trim, and final details were coordinated carefully so the finished home reflected the work behind the walls.
The finished home
The result
After months of excavation, framing, inspections, coordination, and finish work, the project began to look less like a construction site and more like a home. The final details were never about decoration. They were about making sure every decision made earlier in construction came together the way it was intended.