Work starts at the back of the house.
First the crew dug the outline of the new rooms. Then the old back wall came off, down to its framing.
The story
The kitchen was supposed to stay. The roof had other plans.
The original design kept the existing kitchen untouched while the new addition rose behind it, including a living room with a ceiling more than 15 feet high.
Once framing began, the actual roof heights and beam conditions did not match the connection shown on the plans. To create the correct pitch and tie the new roof into the house, part of the roof above the kitchen had to be opened.
A sudden storm reached the exposed area and damaged the kitchen below. We immediately removed the wet insulation and cabinets, brought in drying equipment, protected the open structure, and reorganized the work so framing could continue safely.
From the build
Month by month, from the first footing to the last countertop.
We started with excavation, foundation, and structural framing. The new bedrooms, office, primary suite, and high-ceiling living room went up from the ground while the existing house stayed connected to the work.
First the crew dug the outline of the new rooms. Then the old back wall came off, down to its framing.
Trenches went in next to the old house, then steel and pipes, ready for concrete.
Once the floor was down, the walls went up fast. This is when the rooms started to feel real.
The new roof pitch didn't align cleanly with the existing structure, so we adjusted the framing in the field. Working section by section, we connected the roof properly while keeping the house protected during construction.
The new rafters had to meet the old roof at different heights than the plans showed. Part of the roof over the kitchen had to open up to get the pitch right.
New plumbing, electrical, HVAC, and fire sprinklers ran throughout the expanded areas. Once the walls closed, we coordinated drywall, paint, doors, trim, flooring, and bathroom finishes so the old and new parts read as one home.
Wire lath went on first, then stucco, so the new walls finish just like the old ones.
Insulation, pipes and wiring went in before the walls closed. Then came cabinets and countertops.
Same house. A lot more room.
From the first footings to the finished house.
Drag across the photo to compare.
What the family has now.
The family uses the whole house differently now, and the new part doesn’t feel like an add-on.