Redwood City Family Home Expansion

A major rear addition that gave a small Redwood City home more room to live, work, and grow without losing the parts of the house the family already knew.

Location
Redwood City, CA
Project type
Home Addition • Major Remodeling
Size
2,800 sq ft
Duration
9 Months
Year
2025

The story

The kitchen was supposed to stay. The roof had other plans.

The original design kept the existing kitchen untouched while the new addition rose behind it, including a living room with a ceiling more than 15 feet high.

Once framing began, the actual roof heights and beam conditions did not match the connection shown on the plans. To create the correct pitch and tie the new roof into the house, part of the roof above the kitchen had to be opened.

Then the weather changed.

A sudden storm reached the exposed area and damaged the kitchen below. We immediately removed the wet insulation and cabinets, brought in drying equipment, protected the open structure, and reorganized the work so framing could continue safely.

We build home additions and remodels in Redwood City.

“The roof connection changed the plan in real time.”

“The roof connection changed the plan in real time.”

“The roof connection changed the plan in real time.”

From the build

How it was built

Month by month, from the first footing to the last countertop.

Building the New Footprint

We started with excavation, foundation, and structural framing. The new bedrooms, office, primary suite, and high-ceiling living room went up from the ground while the existing house stayed connected to the work.

September 2024

Work starts at the back of the house.

First the crew dug the outline of the new rooms. Then the old back wall came off, down to its framing.

The crew digs the outline of the new rooms behind the original house.
The back of the original house, at the start of the job.
The old back wall, opened down to its framing.
October 2024

Footings for the new rooms.

Trenches went in next to the old house, then steel and pipes, ready for concrete.

A footing trench dug along the old house.
Steel, plastic sheeting and pipes in place before the pour.
Rebar set in the forms, ready for concrete.
November 2024

A new floor, then walls.

Once the floor was down, the walls went up fast. This is when the rooms started to feel real.

Walls up on the new floor.
Framing the walls of the new rooms.

Working Through the Roof

The new roof pitch didn't align cleanly with the existing structure, so we adjusted the framing in the field. Working section by section, we connected the roof properly while keeping the house protected during construction.

December 2024

The roof, and the change of plan.

The new rafters had to meet the old roof at different heights than the plans showed. Part of the roof over the kitchen had to open up to get the pitch right.

Rafters for the new high ceiling.
New rafters against the sky.
Working inside the new rooms, under the new roof.
The crew up on the roof.

Rebuilding the Home Around It

New plumbing, electrical, HVAC, and fire sprinklers ran throughout the expanded areas. Once the walls closed, we coordinated drywall, paint, doors, trim, flooring, and bathroom finishes so the old and new parts read as one home.

January 2025

Stucco, so old and new match.

Wire lath went on first, then stucco, so the new walls finish just like the old ones.

Wire lath going on, ready for stucco.
Stucco going on.
Spring and summer 2025

Inside the walls, then the finishes.

Insulation, pipes and wiring went in before the walls closed. Then came cabinets and countertops.

Insulation in the ceiling while work goes on in the walls.
Plumbing in the open walls.
Countertops going in.

The finished home

Same house. A lot more room.

The new living room. The ceiling goes up more than 15 feet.
The kitchen. This is the room the storm damaged.
The bathroom, with a double vanity.
One of the two new bedrooms.
And the other one.

Before and after

From the first footings to the finished house.

After: the finished back of the house in blue stucco, with French doors and new deck steps
Before: footing forms in the back yard where the new wing now stands, with the back of the house opened up behind
BeforeAfter

Drag across the photo to compare.

The result

What the family has now.

  • A big living room with a ceiling over 15 feet
  • A dedicated office
  • A new primary suite
  • Two more bedrooms
  • New plumbing, wiring, heating and cooling, and fire sprinklers

The family uses the whole house differently now, and the new part doesn’t feel like an add-on.